QEP Cat-X 2 addl wells exsting Pads 12-21-10
MHA 3-04-03H-149-91 and MHA 3-32-29H-150-91. The proposed drilling of two additional wells would be constructed atop the previously approved well pad and within the previously surveyed ten acre survey area
QEP EA Adden 10 addl wells Existing Pads 12-17-10
Well pad expansion would be constructed in the SE¼ of the SE¼ of Section 31, T150N, R91W.
Zenergy Cat-X Maggie Old Dog 12-6-10
Zenergy proposes to change the well pad spacing from 640 to 1,280 acres for the existing Maggie Old Dog #19-18H, formerly TAT (751A) #14-19H, well pad.
Petro Hunt EA FB 5 well 12-06-10
Fort Berthold #148-95-24C-13-1H & Fort Berthold #148-95-25B-36-1H: SW¼ SW¼, Section 24, Township (T) 148 North (N), Range (R) 95 West (W), Dunn County, North Dakota. Fort Berthold #148-95-26A-35-1H & Fort Berthold #148-95-23D-14-1H: SE¼ SE¼, Section 23, T148N, R95W, Dunn County, North Dakota. Fort Berthold #148-95-3A-10-1H: NE¼ NE¼, Section 3, T148N, R95W, Dunn County, North Dakota.
Enerplus Birdbear CE 11-24-10
The purpose of the proposed action is to authorize Enerplus to drill a second well (Agave 149-93-06C-4H TF) to the Three Forks formation, on the approved Birdbear 6C-1H well pad.
Enerplus Yellowbird CE 11-24-10
The purpose of the proposed action is to authorize Enerplus to drill a second well (Sitka 149-93-06A-3H TF), to the Three Forks formation, on the approved Yellowbird 6A-1H well pad.
Marathon EA Red Feather Well 12-3-10
Red Feather USA 21-17H and Red Feather USA 31-17H wells located in the SE¼NW¼ of Section 8, Township 150 North, Range 93 West, 5th P.M.
Zenergy EA Adden K Soldier BD Pad EXP 12-21-10
proposed action is to authorize land use by Zenergy for the construction and installation associated with the expansion of the previously authorized Dakota-3 Nathan Hale #4-25H well pad, to include two additional wells from a previously approved location. This action would also constitute a name change of the current Dakota-3 Nathan Hale #4-25H well pad to Dakota-3 Nathan Hale #4-25H / Dakota-3 Kate Soldier #23-14H / Dakota-3 Bear Den #24-13H2 well pad.
QEP EA Adden Reroute access 11-23-10
The proposed access road re-alignment would be constructed in the NE¼ of Section 6 and the NW¼ of Section 5, T147N, R92W approximately 60 feet north of the previously authorized access road.
QEP EA 4 MHA wells 12 16 10
MHA 2-05-06H-149-90 located in T149N, R90W, Section 5. MHA 3-05-06H-149-90 located in T149N, R90W, Section 5. MHA 1-11-14H-149-90 located in T149N, R90W, Section 11. MHA 2-10-15H-149-90 located in T149N, R90W, Section 11.
Zenergy EA Adden S Creek GL 11 30 10
Dakota-3 Skunk Creek #1-12H and the Dakota-3 Packineau #15-32H gathering lines in the NW¼ of Section 1, Township (T) 148 North (N), Range (R) 93 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota, and terminating in the NE¼ SW¼ of Section 1, T148N, R93W, 5th P.M., Dunn County, North Dakota
EOG EA 4 well 11 29 10
• Horse Camp #02-11H: NW¼ NW¼, Section 11, Township (T) 149 North (N), Range (R) 93 West (W), Dunn County, North Dakota Horse Camp #03-16H: NW¼ NE¼, Section 16, T149N, R93W, Dunn County, North Dakota. Bear Den #03-30H: NE¼ NE¼, Section 30, T150N, R94W, McKenzie County, North Dakota. Clarks Creek #02-17H: NW¼ NW¼, Section 17, T151N, R94W, McKenzie County, North Dakota
Petro Hunt EA adden Access RD 12-10-10
Access road/utility corridor reroute for 152-93-18B-19-1H well in the NW¼ of Section 18, T152N, R93W
Zenergy EA FBIR TL 12-24 12-16-10
Van Hook Trunkline to FBIR#13-24H Well
EOG Addend Bear Den Access 1-16-10
Access road connecting the Mandaree 10-05H access road to the Bear Den 05-31H well pad
Petro Hunt FB 3 well 11-5-10
Fort Berthold #148-94-19D-18-1H and Fort Berthold #148-94-30A-31-1H: SE1/4 SE1/4, Section 19, Township (T) 148 North (N), Range (R) 94 West (W), Dunn County, North Dakota Fort Berthold #148-94-29B-32-1H: SW1/4 SW1/4, Section 20, T148N, R94W, Dunn County, North Dakota
XTO EA Darcie 34X-14 10-28-10
Darcie 34X-14 Exploratory Well Site with up to 6 wells in the SW¼SE¼ Section 14, T148N, R92W
Saddle Butte Cat-X. Ex Access Road 10-15-10
Saddle Butte Pipeline to use an existing two-track trail in Sections 18 and 19, Township 151N, Range 91W to access their previously approved right-of-way for the proposed Red Tipped Arrow Pipeline
Zenergy EA Adden Beaks GL 10 28 10
Dakota-3 Beaks #36-35H gathering lines in the SE¼ NE¼ of Section 36, Township (T) 149 North (N), Range (R) 93 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota, and terminating in the NE¼ NW¼ of Section 3, T148N, R93W, 5th P.M., Dunn County, North Dakota
Arrow EA Add P1B South 10 26 10
Two Shields Butte #2-24-12H/Skunk Creek #2-24-25H and Two Shields Butte #3-24-12H/Skunk Creek #3-24-25H gathering lines in the NW¼ NE¼ (Two Shields Butte #2-24-12H/ Skunk Creek #2-24-25H) and NE¼ NW¼ (Two Shields Butte #3-24-12H/Skunk Creek #3-24-25H) of Section 24, Township (T) 149 North (N), Range (R) 93 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota. The lines would terminate in the SE¼ SE¼ of Section 16, T149N, R93W, 5th P.M., Dunn County, North Dakota
Peak EA 11 wells 10-15-10
Bradfield #31-14H located in T149N, R94W, Section 31 (single well in McKenzie County) Mandan #8-21H and Mandan #8-31H located on the same pad in T148N, R92W, Section 5 (dual well in Dunn County) Young Bird #12-21H located in T148N, R92W, Section 12 (dual well in Dunn County) Walker #18-34H located in T148N, R93W, Section 18 (dual well in Dunn County) Hans #20-21H located in T148N, R93W, Section 20 (dual well in Dunn County) Likes Eagle #2-31H located in T148N, R95W, Section 2 (dual well in Dunn County)
Marathon EA Windyboy-USA Wells 10-15-10
Windy Boy USA 12-35H and Windy Boy USA 13-35H wells in T152N, R94W, Section 35
Saddle Butte EA Adden Coonections 10-1-10
ROW Width increase for Saddle Butte Trunk Lines
Arrow EA Adden TSB 10-12-10
Two Shields Buttes #14-21-33-15H gathering lines in the NE¼ NW¼ of Section 28, Township (T) 149 North (N), Range (R) 92 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota
XTO EA WaltersPackWolf 31X-12 10-7-10
WalterPacksWolf 31X-12 Well Pad up to 6 wells, located in the NW¼NE¼ of Section 12 in T149N and R92W within Dunn County, North Dakota
Petro Hunt EA FB 2 Well 10 1 10
Fort Berthold 151-94-34C-27-1H and Fort Berthold 150-94-3B-10-1H: NW¼ NW¼, Section 3, Township (T) 150 North (N), Range (R) 94 West (W), McKenzie County, North Dakota
QEP EA 2 MHA Wells 10-26-10
MHA 1-07-18H-149-90 Well located in T49N, R90W, Section 7
Zenergy EA Adden Black Hawk GL 10-6-10
Dakota-3 Black Hawk #15-34H gathering lines in the SE¼ SE¼ of Section 34, Township (T) 149 North (N), Range (R) 92 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota, and terminating in the NE¼ NW¼ of Section 5, T148N, R92W, 5th P.M., Dunn County, North Dakota
QEP Cat-X Reroute GL 9-22-10
Re-route of the MHA Gathering System in Sections 8 and 16, T150N, R90W & NE¼ of Section 17.
Zenergy EA Adden GL Ruth 9- 22-10
Gathering Pipelines Connecting Dakota-3 Helena Ruth Grant #33-34H to Wells #32-29H Gathering Pipeline.
Petro Hunt Addendum EA Access Rd 9-8-10
Access road to the Fort Berthold 152-94-14C-11-1H well site located in T152N, R94W, SW ¼ of Section 14 (referred to as the 11-1H Well). The proposed access road would be located in the south half of Section 14, T152N, R94W, 5th P.M
Arrow Adden TSB to Ph 1B 9 21 10
Two Shields Buttes #16-8-7H and Two Shields Butte #16-8-16H gathering lines in the SE¼ SE¼ of Section 8, Township (T) 149 North (N), Range (R) 92 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota. The lines would terminate in the NW¼ NW¼ of Section 9, T149N, R92W, 5th P.M., Dunn County, North Dakota.
Arrow EA Adden Phase 1 B 9-10-10
Phase 1B reroute would be located on allotted land in the SW¼ SE¼ NE¼, S½ SW¼ NE¼, S½ SE¼ NW¼, N½NE¼ SW¼, NE¼ NW¼ SW¼ of Section 1, Township 148 North, Range 93 West.
QEP Cat-X Added wells existing Pad 8 30 10
QEP to drill the MHA 3-13-14H-150-91 from the existing MHA 2-13-14H-150-91 well pad.
Zenergy EA Adden Dak 3 GL 9-10-10
Dakota-3 Wells #32-29H gathering lines in the SW¼ SE¼ of Section 32, Township (T) 150 North (N), Range (R) 93 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota.
Zenergy EA Adden VanHook 9-27-10
Alternative Route for Gathering Lines for Dakota-3 Mason #2-11 and Dakota-3 Olson #4-1 well sites
Enerplus Birdbear Yellowbird 9 9 10
Birdbear 6C-1H: SE¼ SW¼ of Section 6, Township (T) 149 North (N), Range (R) 93 West (W), Dunn County Yellowbird 6A-1H: NW¼ NE¼ of Section 6, T149N, R93W, Dunn County
Zenergy EA Elk Well 8-30-10
Dakota-3 John Elk #28-27H: NW¼ SW¼, Section 28, Township (T) 150 North (N), Range (R) 93 West (W), Dunn County, North Dakota Dakota-3 Helena Ruth Grant #33-34H: NW¼ NW¼, Section 33, T150N, R93W, Dunn County, North Dakota
Arrow EA Add 8-30-10
Two Shields Buttes #14-33-6H and Two Shields Butte #14-33-28H gathering lines in SE¼ SW¼ of Section 33, Township (T) 149 North (N), Range (R) 92 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota
Saddle Butte EA Trunk Lines 9-9-10
Saddle Butte Trunk Lines are proposed to connect the existing Red Tipped Arrow pipeline and the Burr-Voigt Connection pipeline and provide infrastructure to collect oil and gas from approximately 30 to 250 well sites operated by local producers
Zenergy EA Adden GL KYW 9-10-10
Dakota-3 KYW #27-34H gathering lines in the NE¼ NE¼ of Section 33, Township (T) 150 North (N), Range (R) 94 West (W), 5th Prime Meridian (P.M.), McKenzie County, North Dakota
Peak Cat-X Addl Well on Rabbithead Hall 7-20-10
Audrey Rabbithead Hall #33-11H Well on previously approved Red Tipped Arrow #33-11H well pad. No additional surface disturbance.
Arrow EA Phase 2E 8-2-10
Phase 2E gathering line system would start in the NENE of Section 36, T149N, R92W and will trend south following BIA Road 13 through Section 36. In Section 3, T148N R92W the pipeline route will trend west along the north half of Sections 4 and 5 of T148N R92W. It will cross BIA Road 12 in the NENE of Section 6 T148N R92W and continues west through Sections 1,2 and 3 T148N R93W until it approaches BIA Road 14, trends south and then ties into the Phase 1B – South (BIA 12-14) pipeline ROW
XTO EA 12 Iron Women-Yellow Wold 9-2-10
IronWoman/YellowWolf 21X-10 Exploratory Well Site with up to 12 wells, located in the NE¼NW¼ of Section 10 and the SE¼SW¼ of Section 3 in Township 148N and Range 92W within Dunn County, North Dakota
QEP Cat-X GL install within ROW 7-9-10
Gathering Line installation within existing ROW: MHA 1-06H-149-91, MHA 1-01H-149-92, MHA 1-31H-150-91, MHA 1-06-31H-150-92
QEP EA 4 MHA Wells 9-2-10
MHA-1-33-34H-150-91 located in T150N, R91W, Section 32. MHA-1-32-29H-150-91 and MHA-1-04-03H-149-91 located in T150N, R91W, Section 32 (dual pad). MHA-1-35-36H-149-91 located in T149N, R91W, Section 35.
XTO EA 6 wells from 1 pad 8-18-10
Smith 11X-10 Exploratory Well Site with up to 6 wells located in NW¼NW¼ of Section 10 in Township 149 North and Range 92 West within Dunn County, North Dakota
Arrow EA Adden Phase 1B-South 7-16-10
Phase 1 Van Hook Gathering System: Section 1, 3, 9, 10, 15,& 16 all in T150N, R92W
Arrow EA Adden Phase 1B-South 7-16-10
Pipeline reroute would be located on allotted land in the E/2 of Section 22, Township (T) 149 North (N), Range (R), 93 West (W), Dunn County, North Dakota
Arrow EA Phase 2E-BIA 13 9-10-10
Phase 2E –BIA13 consists of four separate gathering lines located in Sections 9, 10, and 25 in T149N R92W and Sections 17,18,19 and 30 in T149N R91W in Dunn County, North Dakota
Kodiak EA Adden GLine 6-24-10
Gathering lines and electrical lines: Moccasin Creek 13-34-3H, 13-34-28-1H and 13-34-28-2H Two Shields Butte 2-24-12H and 2-24-25H Two Shields Butte 3-24-12H and 3-24-25H Two Shields Butte 14-21-4H, 14-21-16-2H, 14-21-33-15H and 14-21-33-16H3
Kodiak EA Addemdum elec and GLs 6-24-10
Gathering lines and electrical lines: Two Shields Butte 16-8-7H and Two Shields Butte 16-8-16H & Two Shields Butte 14-33-6H and Two Shields Butte 14-33-28H
Kodiak EA Addend Charging Eagle 6-24-10
Gathering lines and electrical lines: Charging Eagle 1-22-10H and 1-22-23H wells & Moccasin Creek 16-34H and 16-34-2H
Marathon EA TAT-Jones wells 7-29-10
TAT – USA #13-23H located in T151N, R94W, 5th P.M., Section 22 Jones – USA #14-14H located in T151N, R94W, 5th P.M., Section 14
Zenery Adden Morsette 7-14-10
Dakota-3 Morsette #35-26H gathering lines: in the NW¼ SE¼ of Section 35, Township (T) 150 North (N), Range (R) 94 West (W), 5th Prime Meridian (P.M.), McKenzie County, North Dakota
XTO EA 1 well 6-25-10
Stephen/Bird 31X-19 Exploratory Well Site up to twelve (12) oil wells at one well pad, located in the NW¼NE¼ of Section 19 in Township 149N and Range 91W within Dunn County, North Dakota
Marathon EA Luther Wells 6-25-10
Luther – USA #11-16H and Luther – USA #31-16H located in T150N, R93W, 5th P.M. Section 9
XTO EA 12 wells one pad 7-27-10
Beaks/HuntsMedicine 24X-8 Exploratory Well Site: up to twelve (12) oil wells at one well pad, Section 8, T149N, R91W
QEP EA 3 MHA Wells 8 30 10
MHA# 2-01-02H-149-91 located in T149N, R90W, Section 6 MHA# 2-07-18H-149-90 and MHA# 1-01-02H-149-91 located in T149N, R90W, Section 6
QEP EA 2 MHA Wells 8-18-10
MHA# 2-13-14H-150-90 located in T50N, R90W, Section 18 MHA# 2-29-30H-150-90 located in T150N, R90W, Section 29
Zenergy EA Adden GL Mandaree 6-24-10
Dakota-3 Mandaree #24-13H/ Dakota-3 Mandaree #30-31H gathering lines:in the NW¼ NW¼ of Section 30, Township (T) 150 North (N), Range (R) 93 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota
Zenergy EA Adden GL Bearstail 7-14-10
Dakota-3 Bearstail #32-29H gathering lines: in the SW¼ SE¼ of Section 32, Township (T) 149 North (N), Range (R) 94 West (W), 5th Prime Meridian (P.M.), McKenzie County, North Dakota and terminating in the NW¼ NE¼ of Section 1, T148N, R95W, 5th Prime Meridian (P.M.), Dunn County, North Dakota
Arrow EA Phase 1 B Prime 7-9-10
Phase 1B - Prime: in SWNW Section 6, T148N R92W and trend west through Section 1, 2, 3, and 4, T148N, R93W, and Section 36, T149N R93W, roughly paralleling BIA Road 12 until it reaches BIA Road 14. At BIA Road 14, the proposed pipeline would trend south paralleling the road to NWSW Section 4, T148N R93W to tie into the approved Phase 1B – South (BIA 12-14) pipeline ROW
Zenergy EA TAT well 7-8-10
Dakota-3 Wells #32-29H: SW¼ SE¼ of Section 32, Township (T) 150 North (N), Range (R) 93 West (W), Dunn County, North Dakota
Spotted Hawk EA Maya-Golden 6-24-10
Golden 22-31H located in the SE ¼ of the NW ¼ of Section 31, T150N, R90W Maya 24-31H located in the SE ¼ of the SW ¼ of Section 31, T150N, R90W
QEP Cat-X new bottom hole loc- 5-20-10
New Bottom Hole location for the MHA 2-14-04H-149-90 well
Marathon EA Goodal Quale Access Rd 6-4-10
Goodall – USA #11-29H located in T152N, R93W, 5th P.M., Section 20 Quale – USA #31-20H located in T152N, R93W, 5th P.M., Section 20 (Access Road)
Zenergy EA Adden GL TAT 15-1H 6-2-10
Dakota-3 TAT (2177) #15-1H gathering lines: in the SW¼ SE¼ of Section 1, Township (T) 149 North (N), Range (R) 93 West(W), 5th Prime Meridian (P.M.), Dunn County, North Dakota and terminating in the NW1/4 NE1/4 of Section 12, T149N, R93W, 5th P.M., Dunn County, North Dakota
Kodiak EA Charging Eagle 9 27 10
Charging Eagle 15-22-15-3H, Charging Eagle 15-22-15-4H,and Charging Eagle 15-22-27H: SWSE Section 22, T147N - R92W
Marathon EA Adden Power Lines 4-28-10
Powerline Installation in Sections 1-6 of T150N, R93W
Petro Hunt EA Adden Access Road 6 14 10
Fort Berthold #148-95-22D-15-1H and Fort Berthold #148-95-27A-34-1H access road:originate in the SW¼ SE¼ of Section 22, Township (T) 148 North (N), Range (R) 95 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota and terminate in the NW¼ NE¼ of Section 27, T148N, R95W, 5th P.M., Dunn County, North Dakota
Zenergy HHawk Adden GL 6-3-10
Dakota-3 High Hawk #4-9H gathering lines: in the NW¼ NW¼ of Section 9, Township (T) 149 North (N), Range (R) 92 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota and terminating in the NW¼ NW¼ of Section 9, T149N, R92W, 5th P.M., Dunn County, North Dakota
Arrow EA Adendum PH 1A 5-7-10
Phase 1A-Northern Extension oil, gas, and water gathering system corridor access road: NW1/4 NW1/4 of Section 4, Township (T) 149 North (N), Range (R), 94 West (W), McKenzie County, North Dakota
XTO EA 10 Well from 1 pad 5-5-10
Baker/Walker 34X-25 Exploratory Well Site up to 10 wells one pad: SW¼SE¼ of Section 25 and the NW¼NE¼ of Section 36 in Township 149N and Range 92W within Dunn County, North Dakota
QEP EA MHA GL 5-10-10
Questar would connect 9 existing and proposed well sites along the corridor to proposed pipeline connections in Section 32 and 33, Township 151 North, Range 90 West in Mountrail County.
EOG EA Bear Den 3-30-10
Bear Den 04-20H: SE¼ SE¼, Section 20, Township (T) 150 North (N), Range (R) 94 West (W) Bear Den 05-31H: SE¼ SE¼, Section 31, T150N, R94W Bear Den 07-17H: SE¼ SE¼, Section 17, T150N, R94W
Marathon EA CFH-Danks-USA 4-23-10
Crow Flies High – USA #31-4H located in T151N, R94W, 5th P.M., Section 4 Danks – USA #11-3H located in T151N, R94W, 5th P.M., Section 3 TAT – USA #34-22H located in T151N, R94W, 5th P.M., Section 22
Kodiak Cat-X bottom hole change 3-15-10
Two Shields Butte 14-21-16-2H Township 149 North, Range 92 West E2 Sections 16 & 21
QEP EA 3 MHA Wells 3-15-10
MHA#1-29-30H-150-90 located in T150N, R90W, Section 32 MHA#1-32-31H-150-90 located in T150N, R90W, Section 32 MHA#1-30H-150-90 located in T150N, R90W, Section 30
Marathon EA galen Fox-Elk Wells 3-4-10
Galen Fox – USA #24-7H located in T150N, R92W, 5th P.M., Section 7 Elk – USA #11-17H located in T150N, R92W, 5th P.M., Section 17
Marathon EA Everett Fisher 3-4-10
Everett Fisher – USA #41-6 (Everett Fisher) exploratory oil and gas well, located in T150N, R93W, 5th P.M., Section 6
EA Zenergy Arikara 3-25-10
D-3 Arikara #15-22H Well: Section 15, T150N, R93W
Arrow EA Ph1B South 3-4-10
Phase 1B South: The gathering system would be installed in a single 100-foot Right-of-Way ROW) for approximately 9.39 miles on the Fort Berthold Indian Reservation in Dunn County, North Dakota. The ROW would be located in Section 16, T149N, R93W and would follow BIA Road 12 south. It would cross BIA Road 12 and continue south to Section 6, T148N, R93W where it would split to the east and west. The eastern route would follow BIA Road 14 and end in Section 4, T148N R93W. The western route will follow BIA Road 14 and end in Section 14, T148N R94W.
Bear Paw EA Pipeline 3-5-10
Bear Paw Energy, LLC 12-inch steel natural gas pipeline begin SE corner of Section 31, Township 151 North, Range 93 West , end NW corner of Section 36, Township 151 North, and Range 95West,
Zenergy EA Adden GL TAT well 3-26-10
Dakota-3 TAT (714A) #2-1H gathering lines: originate on tribal land from the northeast side of the well pad, approximately 6 miles east of Mandaree, North Dakota, in the NW¼ NE¼ of Section 1, Township (T) 148 North (N), Range (R) 95 West (W), 5th Prime Meridian (P.M.), Dunn County, North Dakota. The Dakota-3 TAT (714A) #2-1H gathering lines would terminate, at their junction with the Arrow Phase 1B-Hwy 22 Pipeline, in the NE¼ NW¼ Section 6, T148N, R94W, 5th P.M., Dunn County, ND
QEP EA 4 MHA Wells 3-15-10
MHA-1-23-24H-149-91 and MHA-2-23-24H-149-91 located in T149N, R91W, Section 22 (two wells). MHA-1-26-27H-149-91 and MHA-2-26-27H-149-91 located in T149N, R91W, Section 26 (two wells).
Kodiak Cat-X Bottom Hole Change 3-5-10
Two Shields Butte 14-21-33H3 will be drilled from an existing well pad: Section 21 in Township 149 North, Range 92 West in Dunn County, North
Zenergy EA Adden GL Wolf Well 3-15-10
Dakota-3 TAT (1922) #14-2H gathering lines: Section 2, Township (T) 149 North (N), Range (R) 93 West (W
Zenergy EA 5 Well -KYW, etc 3-4-10
Dakota-3 Black Hawk #15-34H: SE¼ SE¼ of Section 34, Township (T) 149 North (N), Range (R) 92 West (W), Dunn County, North Dakota Dakota-3 Rubia #16-24H: SE¼ SE¼ of Section 24, T149N, R93W, McKenzie County, North Dakota Dakota-3 Beaks #36-35H: SE¼ NE¼ of Section 36, T149N, R93W, Dunn County, North Dakota Dakota-3 Stevenson #15-8H: SW¼ SE¼ of Section 8, T149N, R94W, McKenzie County, North Dakota Dakota-3 KYW #27-34H: SW¼ NW¼ of Section 27, T150N, R94W, McKenzie County, North Dakota
PetroHunt EA 4 Well 3-30-10
¿Fort Berthold 152-94-22D-15-1H located in T152N, R94W, SE ¼ of Section 22 (referred to as the 15-1H Well) ¿Fort Berthold 152-94-14C-11-1H located in T152N, R94W, SW ¼ of Section 14 (referred to as the 11-1H Well) ¿Fort Berthold 152-94-13B-24-1H located in T152N, R94W, NW ¼ of Section 13 (referred to as the 24-1H Well) ¿Fort Berthold 152-93-18B-19-1H located in T152N, R93W, NW ¼ of Section 18 (referred to as the 19-1H Well)
Saddle Butte EA RTA 2-25-10
Red Tipped Arrow 33-11H Well Site to Bear Paw Energy Connection: begin in Section 33, Township 150 North, Range 94 West, progress through Sections 28 and 18-21, Township 150 North, Range 94 West, ending in the SW ¼ of Section 13, Township 150 North, Range 95 West.
Zenergy EA Adden TAT Well 15-1H 3-8-10
Dakota-3 TAT (2177) #15-1H gathering lines: Section 1, Township (T) 149 North (N), Range (R) 93 West(W),
Petro Hunt EA FB 2 Well 3-15-10
•Fort Berthold #148-95-22D-15-1H, NW1/4 NE1/4, Section 27, Township (T) 148 North (N), Range (R) 95 West (W), Dunn County, North Dakota •Fort Berthold #148-95-27A-34-1H, NE1/4 NE1/4, Section 27, T148N, R95W, Dunn County, North Dakota
Kodiak Cat-X Bottom Hole Change 1-25-10
Moccasin Creek 13-34-28H3 new bottom hole location: Section 34 in Township 148 North, Range 93 West in Dunn County, North
Zenergy EA Adden GL Warrior 1-25-10
Dakota-3 Mandaree Warrior #11-14H gathering lines: Section 11, T149N, R94W, 5th P.M., McKenzie County, North Dakota
Zenergy Adden Zenergy Pad Exp Mandaree 3-4-10
Dakota-3 Mandaree #24-13H/ Dakota-3 Mandaree #30-31H dual well pad: NW1/4 NW1/4 of Section 30, Township 150 North (N), Range 93 West (W), Dunn County, North Dakota.
QEP Addendum 1 addl well 1-20-10
Additional well from existing pad MHA #1-19H-150-90: Section 18, T150N, R90W
QEP EA Adden 1 add MHA Well 1-20-10
Additional well from existing pad MHA #1-18H-150-90: Section 18, T150N, R90W
Zenergy EA 6 Wells- Wicke, Coffey,Packineau, etc. 2-24-10
•Dakota-3 Goodbird #36-25H: SE¼ SE¼ of Section 36, Township (T) 148 North (N), Range (R) 93 West (W), Dunn County •Dakota-3 Black Hawk #1-12H: SE¼ SE¼ of Section 36, T148N, R93W, Dunn County •Dakota-3 Packineau #4-32H: C NW¼ of Section 32, T149N, R92W, Dunn County •Dakota-3 Paul Peter Coffey #4-35H: SE¼ SE¼ of Section 27, T148N, R93W, Dunn County •Dakota-3 Mann #16-27H: SE¼ SE¼ of Section 27, T148N, R93W, Dunn County •Dakota-3 Wicker #34-27H: SE¼ SW¼ of Section 34, T149N, R93W, Dunn County
Peak 8 well on 5 pads 1-25-10
•Baker #20-34H and 29-31H located in T149N, R92W, Section 20 (two wells) •Brugh-Bear #2-11H located in T149N, R94W, Section 31 (one well) •Danks #17-44H and 20-41H located in T151N, R94W, Section 17 (two wells) •Eagle’s Nest #34-44H located in T148N, R94W, Section 34 (one well) •Fox Ridge #3-24H and #10-31H located in T149N, R93W, Section 10 (two wells)
Zenergy EA Adam Good Bear 1-21-10
D-3 Adam Good Bear #15-22H Well Site:Section 15, T150N, R92W D-3 Mandan #13-14H well site: Section 13, T150N, R92W D-3 Skunk Creek #1-12H well site: Section 1, T148N, R93W
Zenergy EA Adden GL 3-15-10
Gathering Line Connecting TAT #14-21H to East Mandaree Gathering Pipeline
Zenergy EA Adden Wolf GL 3-15-10
Dakota-3 Wolf #27-34H Gathering Line: Section 27,T149N,R94W
EOG EA mandaree 1-20-10
Mandaree 02-09H: NW¼ NW¼ of Section 9, Township (T) 149 North (N), Range (R) 94 West (W) Mandaree 04-15H: SE¼ SE¼ of Section 15, T149N, R94W Mandaree 05-16H: NW¼ NW¼ of Section 16, T149N, R94W Mandaree 06-20H: NW¼ NW¼ of Section 20, T149N, R94W Mandaree 12-07H: SE¼ SE¼ of Section 7, T149N, R94W Bear Den 08-21H: NW¼ NW¼ of Section 21, T150N, R94W Clarks Creek 01-21H: NW¼ NW¼ of Section 21, T151N, R94W Clarks Creek 03-08H: SE¼ SE¼ of Section 8, T151N, R94W Riverview 01-32H: NW¼ NW¼ of Section 32, T152N, R94W
Arrow Mand. Gatherline 2-24-10
East Mandaree pipeline would start in the NWNW of Section 9, T149N, R92W, and run in an westerly direction for 6.68 miles (roughly following BIA Road 10) terminating in the NENW of Section 16, T149N, R93W
Zenergy Cat-X BH Change Warrior #11-14H 1-5-10
Dakota-3 Mandaree Warrior #11-14H, formerly Dakota-3 TAT (694A) #3-11H Bottom Hole Change:Section 11, T149N, R94W
Zenergy EA Adden GL Ben 2-24-10
Dakota-3 Benson #16-3H gathering lines: Section 3,T149N,R94
QEP EA 4 MHA Wells 1-20-10
MHA #1-05-08H-147-92 & MHA #2-05-08H-147-92 well site is located in the NWNW of Section 5:T147N-R92W. MHA #1-32-33H-148-92 & MHA #2-32-33H-148-92 well site is located in the NENW of Section 32:T148N-R92W.
Zenergy EA Adden GL patricia 1-16-10
Gathering Pipelines Connecting Dakota-3 Patricia Charging #4-15H to Dakota-3 Alisia Fox #16-9H to Arrow Trunk Pipeline: Section 15,T149N,R93W
Zenergy EA 5 Well EA 1-20-10
•Dakota-3 Benson #3-9H: NE¼ NW¼ of Section 9, Township (T) 148 North (N), Range (R) 93 West (W), Dunn County, North Dakota •Dakota-3 High Hawk #4-9H: NW¼ NW¼, Section 9, T149N, R92W, Dunn County, North Dakota •Dakota-3 Joseph Eagle #16-19H: SE¼ SE¼, Section 19, T149N, R93W, Dunn County, North Dakota •Dakota-3 Fettig (860 A-B) #16-22H: SE¼ SE¼, Section 22, T149N, R94W, McKenzie County, North Dakota •Dakota-3 Morsette #35-26H: SE¼ SE¼, Section 35, T150N, R94W, McKenzie County, North Dakota
Simray EA H Bad Gun 4 Well 1-20-10
•Henry Bad Gun 8D-5-1H: SE¼ SE¼ of Section 8, Township (T) 147 North (N), Range (R) 93 West (W), Dunn County •Henry Bad Gun 17A-20-1H: NE¼ NE¼ of Section 17, T147N, R93W, Dunn County •Henry Bad Gun 9C-4-1H: SW¼ SW¼ of Section 9, T147N, R93W, Dunn County •Henry Bad Gun 16B-21-1H: NW¼ NW¼ of Section 16, T147N, R93W, Dunn County
Zenergy EA Elk and Olson 1-21-10
D-3 Elk #16-21H & D-3 Olson #1-12H Wells:located in Section 16, T150N, R92W, and Section 1, T150N, R92W
Kodiak EA 10 Well EA 1-20-10
Skunk Creek #2-8-17H:Section 8,T148N - R93W Skunk Creek #4-8-17H:Section 8,T148N - R93W Skunk Creek #4-10-11H:Section 10,T148N -R93W Skunk Creek #12-10-11H:Section 10,T148N - R93W Two Shields Butte #5-7-8H:Section 7,T149N - R92W